Part of the region of Harbin in 8 to 18 days to six outage notification rainlendar

Part of the region of Harbin in 8 to 18 days to six outage notice due to non core area of distribution network reconstruction and other reasons, in November 8th to 18 days, 22 days, and Nangang Road, Daoli, cottage and other parts of the region are related to electric power, please prepare for power outages. Daowai District power lines: 66kV 10kV light is a Pacific line outage time: November 9th 8:00 to 20:00 power failure reasons and scope: engineering due to the transformation of non core area distribution network: Binjiang Phoenix area 101, 102, 103, 104, 105, 106, 107, 108, 109, 201, 202, 203 buildings other area, Wu Sheng Miao blackout. Tel: 84662592 power lines: 66kV new 10kV Ling line outage time: November 10th from 8:00 to 18:00 and the causes of power failures: engineering due to the transformation of non core area distribution network: South seven street (Jingyu street to the rich Street area) and other area blackout. Tel: 84662592 Songbei power lines: 66kV 10kV Sun Island landscape line outage time: November 9th 6:00 to 17:00 power failure reasons and scope: engineering due to the transformation of non core area distribution network: Songbei District, on both sides of the road, Salice, North Peak skating Museum District, business district University B (standby), Songbei Management Authority Bureau of archives collection Le sewage treatment plant, water treatment plant, set le East Village residents area blackout bliss. Tel: 88110264 Xiangfang power lines: 220kV Kazakhstan 10kV forage line outage time: November 9th 7:00 to 17:00 power failure reason and scope: due to the transformation of Engineering in non core areas of distribution network: parts of area 1, No. 2 Xiang Kang building, Gongbin road 567 to No. 585, No. 64 Zhongshan Road Street No. 11 fragrant incense Kang Kang Street residents and business departments of power, Xiangfang Street 65 to No. 73, Xiang Wu alley No. 12, No. 26, No. 5, Stuart Street residents in some areas and the business sector area blackout. Tel: 84662438 power lines: 66kV Chaoyang 10kV electrical line a part of the power outage time: November 14th 6:00 to 17:00 power failure reason and scope: due to the transformation of Engineering in non core areas of distribution network, industrial control, energy burning ha ha, flying in the wind power electric technology, Kazakhstan installation, Xinzhou power, Starr glass steel, heat transfer station and the street area blackout. Tel: 84662470 power lines: 66kV 10kV North premixed line outage time: November 15th 6:00 to 17:00 power failure reason and scope: due to the transformation of Engineering in non core areas of distribution network: area of Dongsheng Village, grain and other power. Advisory Tel: 86506394 Nangang power line: 220kV center into the 10kV security line, part of the Yushan line outage相关的主题文章: